Home / EU MDR / MDR CE Marking
EU MDR 2017/745 · Class I, IIa, IIb & III

EU MDR CE Marking for Class I, IIa, IIb & III Medical Devices

We take your device from classification to CE certificate under EU MDR 2017/745: technical documentation, clinical evaluation, PMS and PMCF planning, testing and Notified Body coordination, so you reach the EU market without avoidable delays.

4MDR risk classes
22classification rules (Annex VIII)
2027/28legacy MDD transition deadlines
The basics

What is MDR CE marking?

MDR CE marking shows that your medical device meets the General Safety and Performance Requirements of the EU Medical Device Regulation (EU) 2017/745. Without it, you cannot sell the device in the European Union.

The route depends on risk class. Class I manufacturers self-declare conformity, while Class IIa, IIb and III devices, and sterile, measuring or reusable surgical Class I devices, need a Notified Body to audit the quality system and review the technical documentation before a CE certificate is issued.

Notified Body reviewRequired for Class IIa, IIb, III and Is/Im/Ir devices.
Technical documentationAnnex II and III files that prove safety, performance and clinical benefit.
Ongoing obligationsPost-market surveillance, PMCF, vigilance and periodic reports after certification.
Routes by risk class

Which MDR conformity route applies to your device?

Classification under Annex VIII decides who assesses your device and how long certification takes. Timelines below are typical and depend on file readiness and the Notified Body queue.

ClassExample devicesConformity routeNotified BodyTypical timeline
Class IBandages, walking aids, non-sterile examination glovesSelf-declaration (Article 52(7))No (yes for Is, Im, Ir aspects)3–6 months
Class IIaHearing aids, short-term catheters, dental fillingsAnnex IX QMS audit + sampled technical documentation reviewYes12–18 months
Class IIbInfusion pumps, ventilators, bone fixation platesAnnex IX QMS audit + technical documentation review (each implantable)Yes12–18 months
Class IIIHeart valves, absorbable sutures, breast implantsAnnex IX full QMS + technical documentation review for each device; clinical investigation usually requiredYes18–24 months
How it works

The MDR CE marking process, step by step

This is how we take a device from first assessment to CE certificate and beyond.

  1. 1

    Classify the device

    All classes

    We confirm intended purpose and apply the Annex VIII rules to fix the risk class and conformity route.

  2. 2

    Gap analysis & QMS

    All classes

    We check your current files against MDR and set up or upgrade your ISO 13485:2016 quality management system to meet Article 10.

  3. 3

    Technical documentation

    Annex II & III

    We prepare the device description, GSPR checklist, risk management file, verification and validation evidence, labels, IFU and PMS documentation.

  4. 4

    Testing & clinical evaluation

    ISO 10993 · IEC 60601 · IEC 62304

    We plan and coordinate testing with associated labs and write the clinical evaluation report under Article 61 and Annex XIV.

  5. 5

    Notified Body assessment

    Class Is/Im/Ir, IIa, IIb, III

    We help you choose a Notified Body, submit the application, prepare for the QMS audit and answer technical documentation questions until closure.

  6. 6

    Certificate, DoC & registration

    CE mark

    You sign the EU Declaration of Conformity and affix the CE mark. We complete UDI assignment, EUDAMED registration and, for non-EU makers, EU Authorised Representative appointment.

  7. 7

    Post-market surveillance

    Ongoing

    We keep you compliant with PMS plans, PMCF, PSUR or PMS reports, vigilance and annual surveillance audits.

The file

What goes into MDR technical documentation?

01
Device descriptionIntended purpose, variants, accessories and specifications.
02
Labels & IFUInformation supplied by the manufacturer under Annex I, Chapter III.
03
Design & manufacturingDesign stages, manufacturing sites, processes and suppliers.
04
GSPR checklistHow each Annex I requirement is met, with standards and evidence.
05
Risk managementBenefit-risk analysis and risk file under ISO 14971.
06
Verification & validationBench, biocompatibility, electrical safety, software and usability data.
07
Clinical evaluationCER, clinical evaluation plan and PMCF plan.
08
PMS documentationPMS plan and PSUR or PMS report under Annex III.
Moving from MDD

MDD to MDR transition deadlines

Regulation (EU) 2023/607 extended the transition for legacy devices, but only if the manufacturer met set conditions. These are the dates that matter.

DateWhat it means
26 May 2021MDR applies to all new devices placed on the EU market.
26 May 2024Deadline to have an MDR quality system in place and lodge a formal application with a Notified Body.
26 Sep 2024Deadline for a signed written agreement with the Notified Body.
31 Dec 2027End of transition for Class III and Class IIb implantable legacy devices.
31 Dec 2028End of transition for other Class IIb, Class IIa and Class I devices that need a Notified Body.
Our MDR service

Our MDR CE marking services

Classification & strategyRisk class, conformity route and Notified Body shortlist.
Gap analysis & MDD transitionUpgrading legacy MDD files and QMS to MDR.
Technical documentationComplete, audit-ready Annex II and III files.
Clinical evaluation & PMCFCER, PMCF plan and report aligned with Annex XIV and MDCG guidance.
Biocompatibility testingTesting in associated labs in India, Poland and the USA.
EU Authorised RepresentativeArticle 11 representation with EUDAMED and UDI registration.
FAQ

MDR CE marking FAQs

How long does it take to get CE marking under MDR?

Class I (non-sterile, non-measuring) devices are self-declared, so it is mainly the time needed to complete your technical documentation, often 3 to 6 months. Class IIa, IIb and III devices need a Notified Body; plan for around 12 to 18 months, or longer for Class III, depending on the Notified Body queue and how ready your file is.

Do you help with Notified Body selection?

Yes. We shortlist Notified Bodies designated for your device codes, compare scope, review timelines and fees, and support you through the application, audits and technical documentation review.

What happens if my device was CE marked under the MDD?

Legacy MDD devices can stay on the market until 31 December 2027 (Class III and Class IIb implantable) or 31 December 2028 (other classes), provided the conditions of Regulation (EU) 2023/607 are met, including an MDR quality system and a signed Notified Body agreement. We run a gap analysis and upgrade your MDD file to meet MDR.

What documents are needed for MDR CE marking?

The core set is the technical documentation (Annex II), post-market surveillance documentation (Annex III), the GSPR checklist (Annex I), the risk management file (ISO 14971), the clinical evaluation report, labels and IFU, an ISO 13485 quality management system and the EU Declaration of Conformity.

Do non-EU manufacturers need an EU Authorised Representative?

Yes. Under MDR Article 11, a manufacturer based outside the EU must appoint an EU Authorised Representative before placing a device on the EU market. REGHELPS provides this service along with EUDAMED and UDI registration.

Which Class I devices need a Notified Body?

Class I devices that are sterile (Is), have a measuring function (Im) or are reusable surgical instruments (Ir) need a Notified Body for those specific aspects. All other Class I devices are self-declared by the manufacturer.

Not sure which MDR route your device needs?

Send us your device details using the form below and we'll confirm its class and conformity route at no cost.

Get a free quote

Read our Privacy Policy.